Reduction in operational costs
The Challenge: Eliminate an undersea cable, replace by resilient comms
For an Offshore operator in West Africa, instead of specifying an underseas cable, manufacturing and then laying between two locations some 25kms apart this was substituted by a new and resilient satellite communications system.
The Outcome
Result, saving in time in bringing the offshore field into production and a saving considerable engineering and cable costs. Net benefit, millions of dollars saved.