Projects

Build and maintain a specialist vessel

The Challenge: Long term build and maintain

For specific task, operating 500 nm from port, a new vessel ‘ABFC Thaiyak’ was designed, built and delivered on time. And then maintained in a high state of readiness thereafter for Australian Border Force.

The Outcome

Net benefit, a cost effective and reliable solution over time.

Freight and logistics analysis

The Challenge: Recommendation for vessels and storage

For an operator of fuel oil delivery vessels, a full analysis of the logistics and storage and safety aspects undertaken.

The Outcome

Net benefit, a new approach to reduce operational costs and improve reliability.

UK fishing vessel fleet monitoring

The Challenge: Design, install and maintain

AST designed and installed an Inmarsat based solution for 800 vessels and managed the transition to Iridium based technology.

The Outcome

Net benefit, long term provision of vessel monitoring accommodating uninterrupted technology change.